BASE PREPARATION GUIDE
A proper preparation of the base pad for your tank will ensure that the installation process goes smoothly. Please follow the guide in this page to prepare your tank base.
A proper preparation of the base pad for your tank will ensure that the installation process goes smoothly. Please follow the guide in this page to prepare your tank base.
MODEL |
TANK DIAMETER |
MINIMUM PAD DIAMETER |
MINIMUM PAD THICKNESS |
m3 OF SAND/CRUSHER DUST |
m3 OF BLUE METAL |
MINIMUM WATER (LITRES) |
---|---|---|---|---|---|---|
CT6 |
3.92m |
6.00m |
150mm |
4.3m3 |
1.0m3 |
2,500 |
CT9 |
4.70m |
6.70m |
150mm |
5.3m3 |
1.0m3 |
4,000 |
CT12, HGT55 |
5.49m |
7.50m |
150mm |
6.7m3 |
1.0m3 |
5,500 |
CT15, HGT75 |
6.26m |
8.30m |
150mm |
8.2m3 |
1.2m3 |
7,000 |
CT20, HGT90 |
7.06m |
9.10m |
150mm |
9.8m3 |
1.2m3 |
9,000 |
CT25, HGT110 |
7.84m |
9.90m |
150mm |
11.6m3 |
1.2m3 |
11,000 |
CT30, HGT135 |
8.63m |
10.70m |
150mm |
13.5m3 |
1.2m3 |
13,500 |
CT35, HGT160 |
9.41m |
11.50m |
150mm |
15.6m3 |
1.6m3 |
16,000 |
CT41, HGT188 |
10.18m |
12.20m |
150mm |
17.6m3 |
1.8m3 |
18,500 |
CT48, HGT220 |
10.99m |
13.00m |
150mm |
20.0m3 |
2.0m3 |
21,500 |
CT54, HGT250 |
11.77m |
13.80m |
150mm |
22.4m3 |
2.0m3 |
24,500 |
CT60, HGT285 |
12.55m |
14.60m |
150mm |
25.2m3 |
2.0m3 |
28,000 |
CT70 |
13.31m |
15.40m |
150mm |
28.0m3 |
3.0m3 |
31,500 |
CT80 |
14.09m |
16.10m |
150mm |
30.6m3 |
3.0m3 |
35,500 |
The preparation of the pad for your tank is the responsibility of the customer. Our preferred base material is fine crusher dust; however, if crusher dust is not available in your area, please insist on using screened sand from your local area
(please do not use recycled sand as it may contain contaminants). It must be free of sticks, stones, and clay lumps (6mm diameter or less).
IMPORTANT: If the site is cut and filled to form the base for the tank, ensure there is adequate compaction (minimum allowable bearing pressure of 120kPa) of the sub soil to avoid subsidence.
IMPORTANT: Adequate drainage must be installed to divert water run off away from the tank.
IMPORTANT: If site access or the pad quality is not adequate, it may be necessary to charge an hourly rate of $65.00 per person for our installation team to leave the tank and reschedule the installation (possibly weeks) until the problem is corrected.
Attendance:
Water:
Payment:
A tax invoice will be forwarded upon notification by the installer of Practical Completion.